A really good explanation of why importing LNG to the EU won’t happen.
The German minister who wishes that we should “freeze for freedom” will soon have his wish granted, it would seem.
" Hybrid Warfare and Gaseous Absurdity
The RF has demanded payment in roubles. The response of the EU states is to refuse this demand. The RF has indicated it will terminate the supply of LNG for non-payment. The EU suggests it will seek substitute LNG supply. The EU position represents an absurdist element of Hybrid Warfare. This post sets out some of the issues.
According to the IEA the EU consumed 155 billion cubic metres of LNG in 2021. Of this supply 45% was obtained from Russia ( How Europe can cut natural gas imports from Russia significantly within a year - News - IEA ).
The RF 2021 EU import share was 69.75 billion cubic metres per year or 5.8 billion cubic metres LNG per month. If the EU seeks to substitute for RF LNG this is the approximate monthly quantity required.
The largest LNG tankers are the QMAX class. These can transport 266,000 cubic metres of LNG ( Q-Max - Wikipedia ).
A simple calculation shows the monthly transport of 5.8 billion cubic metres of LNG by vessels with a capacity of 266,000 cubic metres of LNG requires a total of 21,852 shipments per month or approximately 705 shipments per day.
This volume of shipping will saturate the existing EU LNG offloading ports. These ports are already dedicated to handling other LNG imports. The time to unload an LNG cargo is approximately one day. This implies the need to construct 705 new LNG offloading ports because immediately following the day 1 arrival of 705 vessels there will be the Day 2 arrival of another 705 vessels with the same vessel traffic for Day 3 and all following days. The transit from Houston to Rotterdam takes 18 days outbound and 18 days empty return. With one day devoted to loading, and a further day to unloading, each vessel will spend 28 days on voyage. These figures make no allowance for vessel downtime for required maintenance intervals.
The transport of the required monthly volume of LNG will therefore require 705 QMAX x 31 days or total QMAX fleet of 21,855 vessels. Since the available yards are fully booked it is not clear when the full build out of the required fleet will occur. My experience in the offshore industry is that it takes approximately two years to construct an offshore drilling rig (MODU). The complexity of a QMAX may be slightly less than a MODU but even if construction were to require no more than a single year the required time to fleet completion would be 5,463 years if 4 yards were involved in the build out. At present the only yard competent in this vessel construction is in South Korea; the other three required yards would need to be upgraded, or new built. LNG tankers require a speciality steel to address thermal stress issues. This steel has a high nickel content; Russia is a major global supplier of nickel.
Since the EU has voiced the intention to fully eliminate the need for Russian LNG by the year 2030 the time to recover the investment in vessels and related LNG infrastructure is extremely limited. Within 8 years the EU seeks to fully replace the entire volume of LNG represented by Russian imports. The IEA Net Zero Emissions by 2050 Roadmap helps fulfil the European Green Deal, an ambitious plan to eliminate all FF emissions in 28 years.
In 2020, U.S. natural gas production was about 10% greater than U.S. total natural gas consumption. The volume of produced gas surplus to US demand amounts to 91.5 billion cubic feet per day or 2.5 billion cubic metres of natural gas per day. This surplus is already contracted to the following countries:
TOP 10 US EXPORT DESTINATIONS
SOUTH KOREA…453,483
CHINA…449,667
JAPAN…354,948
BRAZIL…307,714
SPAIN…215,062
INDIA…196,218
UK…195,046
TURKEY…188,849
NL…174,339
FRANCE…170,780
The US is therefore in the position of withdrawing supply from some of the above to punish them for lack of compliance to US demands and to reward vassal states. Looking at the list, which countries do you think will be disfavoured?
The full list of US foreign LNG exports by country is found here:
https://www.eia.gov/dnav/ng/NG_MOVE_EXPC_S1_A.htm
Any commodity gravitates toward the highest price. The peak price is set by the marginal buyer. It is expected that the EU attempt to displace Russian LNG supply will be impossible to achieve in the short term without an extreme impact on price. These price impacts will not only affect EU consumers, they will impact all consumers including those in the US.
The EU will replace dependency on Russia by dependency on the “international rules based order” as interpreted by the global hegemon.
Posted by: Sushi | Mar 29 2022 19:03 utc | 26"
The absurdity of ‘Sanction Russia’ was the comment that building all these ships will require Russian nickel to build them!